Reserve Study Component List
Here are items that should be considered in a reserve study.

Needed for Reserve Study Research

  • Governing Documents (Declaration, Bylaws)
  • Site Plan
  • Blueprints (As Built)
  • Current Year’s Budget
  • Most Recent Year End Financial Statement
  • Current Reserve Balance $___________
  • Interest Earned on Reserves?: ____%

Reserve Components List

Card Entry System
Chimneys & Chimney Caps
Clubhouse-Appliances
Clubhouse-Flooring
Clubhouse-Furniture
Clubhouse-Office Equipment
Clubhouse-Painting-Interior
Clubhouse-Window Treatments
Concrete Safety Repair
Deck & Deck Rail Repair
Parking Garage Door
Parking Garage Operator
Elevator Cab Renovation
Elevator Safety Inspection
Elevator Technology Update
Entry System
Fence-Chain Link
Fence-Masonry or Brick
Fence-Wood
Fire Alarm System
Fire Sprinkler System
Flooring-Carpet
Flooring-Vinyl
HVAC-Heating & Cooling Equipment
Landscape Renovation
Lighting-Exterior-(describe fixture)
Lighting-Interior-(describe fixture)
Mailboxes
Paint-Exterior
Paint-Interior
Path Reconstruction
Paving-Asphalt-Overlay
Paving-Asphalt-Sealcoat
Pond-Fountains & Pumps
Pond-Clean Up
Pond-Renovation
Pool-Deck
Pool-Filter
Pool-Furniture
Pool-Water Heater
Pool-Pump
Pool-Replaster
Roof-Composition Shingles
Roof-Cedar Shingles/Shakes
Roof-Flat-Built Up
Roof-Gutters & Downspouts
Security System
Sidewalks/Driveways-Concrete
Siding & Trim Repair
Signage-Building
Signage-Main Entry
Signage-Street & Directional
Spa-Filter
Spa-Pump
Spa-Replaster
Spa-Water Heater
Sprinkler System
Storage Units
Tennis Court Net
Tennis Court Fencing
Tennis Court Resurface
Treework

© Copyright 1996-2002 by Regenesis.net
All rights reserved.